Western Radio Services Co. v. Qwest Corporation

United States District Court, D. Oregon
May 5, 2009
Civil No. 05-159-AA (D. Or. May. 5, 2009)

Opinion

Civil No. 05-159-AA.

May 5, 2009

Marianne Dugan, Attorney at Law, Eugene, Oregon, Attorney for plaintiff.

Gregory B. Monson, Stoel Rives LLP, Salt Lake City, Utah, Alex M. Duarte, Qwest Corporate Counsel, Portland, Oregon, Attorneys for defendant Qwest Corporation.

John Kroger, Attorney General, Michael T. Weirich, Assistant Attorney General, Department of Justice, Salem, Oregon, Attorneys for defendants Public Utility Commission, Lee Beyer, Ray Baum and John Savage.


OPINION AND ORDER


Plaintiff Western Radio Services ("Western") brings a complaint for declaratory and injunctive relief pursuant to 47 U.S.C. § 252(e)(6) of the Telecommunications Act of 1996, Pub. Law. No. 104-104, 110 Stat. 56 (1996), codified at 47 U.S.C. §§ 151 et seq. (the "Act"); and 42 U.S.C. § 1983.

Defendants Qwest Corporation ("Qwest") and the Oregon Public Utility Commission, Lee Beyer, Ray Baum and John Savage (collectively the "PUC") move to dismiss Western's Second Cause of Action alleging that Qwest failed to negotiate in good faith because the PUC has not addressed this claim as required byWestern Radio Servs. Co. v. Qwest Corp., 530 F.3d 1186 (9th Cir. 2008). Additionally, all defendants move to dismiss Western's request for jury trial because this matter is before the court on appellate review. Finally, the PUC moves to dismiss Western's 42 U.S.C. § 1983 claim as scrivener's error. The court heard oral argument on April 27, 2009. The motions to dismiss are granted.

STATUTORY FRAMEWORK

Under the Act "incumbent local exchange carriers," are obligated to provide "interconnection" to newer local exchange carriers, called "requesting" carriers in the statute. 47 U.S.C. § 251(c)(2).

If a carrier requests interconnection, the requesting carrier and the incumbent carrier to whom the request is made have a duty to "establish reciprocal compensation arrangements" for interconnection. 47 U.S.C. § 251(b)(5). In creating such an interconnection agreement, both the incumbent carrier and the requesting carrier have a "duty to negotiate in good faith . . . the particular terms and conditions" of such agreements. 47 U.S.C. § 251(c)(1). The Act sets out a procedural framework for these negotiations: First, a requesting carrier must make a request for interconnection to an incumbent carrier, which "may negotiate and enter into a binding agreement with the requesting . . . carrier . . . without regard" to the substantive standards of 47 U.S.C. § 251. 47 U.S.C. § 252(a)(1). The parties to the negotiation may, if they wish, ask a state public utilities commission "to mediate any differences arising in the course of the negotiation." 47 U.S.C. § 252(a)(2).

If the parties cannot reach agreement through voluntary negotiations or mediation, either may "petition a State commission to arbitrate any open issues." 47 U.S.C. § 252(b)(1). In resolving the open issues through compulsory arbitration, a state commission must ensure that its resolution "meet[s] the requirements of section 251" and may "impos[e] appropriate conditions" to ensure the requirements of 47 U.S.C. § 251 are met. 47 U.S.C. §§ 252(b)(4)(C), (c)(1). If during arbitration a party refuses "to participate further in the negotiations, to cooperate with the State commission . . ., or to continue to negotiate in good faith in the presence, or with the assistance, of the State commission," such action "shall be considered a failure to negotiate in good faith." 47 U.S.C. § 252(b)(5). Section 252 does not specify what remedy, if any, is available for failure to negotiate in good faith.

Once an interconnection agreement has been adopted either by negotiation or after compulsory arbitration, it must "be submitted for approval" to the state commission, which must either "approve or reject the agreement." 47 U.S.C. § 252(e)(1). Finally, the 1996 Act provides for judicial "[r]eview of State commission actions":

In any case in which a [Public Utilities Commission] makes a determination under this section, any party aggrieved by such determination may bring an action in an appropriate Federal district court to determine whether the agreement or statement meets the requirements of section 251 of this title and this section.
47 U.S.C. § 252(e)(6).

FACTUAL AND PROCEDURAL BACKGROUND

Western is a licensed Commercial Mobile Radio Service provider incorporated under the laws of Oregon with its principle place of business in Bend, Oregon. Western alleges that negotiations under the Act between Qwest's predecessor, US West, and Western began in August 1996. Supplemental Complaint, ¶ 17. Negotiations resolved some, but not all, of the issues between the parties and so in March 2004, Western filed a petition with the PUC for arbitration pursuant to § 252(b) of the Act. Id. at ¶¶ 18-19. In its petition, Western identified five issues remaining for arbitration. Id. at ¶ 20. In its response, Qwest identified ten additional issues for arbitration. Id. at ¶ 20.

The Arbitrator issued his decision on September 20, 2004. See Ex. 1, attached to original Complaint. In his decision, the arbitrator ordered that Qwest's proposed language be adopted as to all but one issue. The arbitration order instructed that "[w]ithin 30 days of the date of the [PUC's] final order in this proceeding, Qwest and Western shall submit an interconnection agreement consistent with the terms of this decision." Id. Subsequently, Western filed exceptions to the arbitrator's order. Supplemental Complaint, ¶¶ 22-23.

On October 18, 2004, despite Western's exceptions, the PUC in Order No. 04-600 adopted the arbitrator's decision in its entirety. See Ex. 2, attached to the original complaint. This triggered a statutory requirement for Western, as petitioner, to prepare a compliant interconnection agreement and serve it on Qwest within fourteen days of the order. Western failed to do so. Supplemental Complaint, ¶¶ 22-23. In addition, Western was required to submit a compliant interconnection agreement to the PUC within thirty days, however Western again failed to do so.

"Within 14 days after the Commission issues its arbitration decision, petitioner must prepare an interconnection agreement complying with the terms of the arbitration decision and serve it on respondent. Respondent shall either sign and file the agreement, or file objections to it, within 10 days of service of it." Or. Admin. R. 860-016-0030(12) (2009).

Nonetheless, on November 10, 2004, Qwest submitted an interconnection agreement to Western for review. In response, Richard Oberdorfer, Western's owner, informed Qwest he would be out of town and would not review the document until he returned.Id. at ¶ 25. Despite this, on November 18, 2004, Qwest timely filed the proposed agreement with the PUC. The agreement was not signed by Western.

On November 29 and December 1, 2004, Western reviewed Qwest's proposed interconnection agreement, ex. 3, attached to original Complaint, and found some areas "where that document did not comply with the Commission Order." Id. at 27.

Instead of informing the PUC of its concerns, Western, on February 3, 2005, filed this action. Western alleged that the district court had jurisdiction over its suit "pursuant to 47 U.S.C. § 252(e)(6), 42 [sic] U.S.C. § 207, and 28 U.S.C. §§ 1331 and 1343(a)."

In its Complaint, Western brought the following causes of action: (1) PUC's violation of delegated authority, 47 U.S.C. §§ 251, 252; (2) Qwest's failure to negotiate the interconnection agreement in good faith, 47 U.S.C. §§ 251(C), 252(A); (3) violation of 42 U.S.C § 1983, civil rights/due process against the Commission and individual defendants; and (4) violation of 42 U.S.C. § 1983 civil rights/equal protection against the Commission and individual defendants.

The defendants moved to dismiss all causes of action for lack of subject-matter jurisdiction and failure to state a claim. See Fed.R.Civ.P. 12(b)(1), (6). Additionally, Qwest, PUC, and PUC's Commissioners argued the court lacked jurisdiction because the PUC had neither approved nor rejected an interconnection agreement. Moreover, all defendants argued the court lacked jurisdiction to consider the "good faith" cause of action because it had not been decided by the PUC. The PUC and its Commissioners also contended that Western's § 1983 causes of action were barred by the Eleventh Amendment and by absolute and qualified immunity.

This court, in an opinion and order filed on July 25, 2005, dismissed the entire action for lack of jurisdiction. Western responded by filing an appeal to the Ninth Circuit Court of Appeals ("Ninth Circuit").

After this court's opinion and order issued, Qwest sought PUC approval of the interconnection agreement submitted on November 18, 2004. On October 10, 2005, the PUC approved the interconnection agreement in Order No. 05-1075, Docket ARB 537. On October 14, 2005, four days after the approval of the interconnection agreement, Western petitioned the PUC for arbitration, Docket ARB 706. In its petition, Western identified several issues for arbitration, including an allegation that Qwest failed to negotiate in good faith. On January 3, 2006, however, the PUC dismissed Western's petition.

This opinion refers to both Docket ARB numbers and order numbers. A Docket ARB number is a number assigned by the PUC when it receives a petition for arbitration under the Act. The ARB number is analogous to a case number. An order number is assigned by the PUC to each order issued during an arbitration.

On July 9, 2008, the Ninth Circuit vacated and remanded this court's opinion dismissing Western's action. Western Radio Servs. Co., 530 F.3d 1186 (9th Cir. 2008). The Ninth Circuit held this court has jurisdiction over Western's good faith claim. However, the Ninth Circuit further held as a prudential matter that prior to filing suit Western must first present Qwest's alleged failure to negotiate in good faith to the PUC. Finally, the Ninth Circuit instructed this court to inquire whether the PUC had, in fact, addressed the good faith claim. If it had, then this court should consider whether Western has a cause of action under 47 U.S.C. § 207 for Qwest's alleged failure to negotiate in good faith. The Ninth Circuit, however, held that if the PUC had not addressed Western's claim, then prudential concerns required Western to present its claim first to the PUC before bringing suit in district court.

Regarding Western's 42 U.S.C. § 1983 claims, the Ninth Circuit remanded for further proceedings in light of an interconnection agreement approved by the PUC.

STANDARDS

Under Fed.R.Civ.P. 12(b)(6), once a claim has been stated adequately, it may be supported by "showing any set of facts consistent with the allegations in the complaint." Bell Atlantic Corp. v. Twombly, 550 U.S. 544, 127 S.Ct. 1955, 1960 (2007). See also, Litchfield v. Spielberg, 736 F.2d 1352, 1357 (9th Cir. 1984), cert. denied, 470 U.S. 1052 (1985). For the purpose of the motion to dismiss, the complaint is liberally construed in favor of the plaintiff, and its allegations are taken as true. Rosen v. Walters, 719 F.2d 1422, 1424 (9th Cir. 1983).

Although courts generally assume the facts alleged are true, courts do not "assume the truth of legal conclusions merely because they are cast in the form of factual allegations." W. Mining Council v. Watt, 643 F.2d 618, 624 (9th Cir. 1981). Accordingly, "[c]onclusory allegations and unwarranted inferences are insufficient to defeat a motion to dismiss." In re Stac Elecs. Sec. Litig., 89 F.3d 1399, 1403 (9th Cir. 1996) (quoting In re VeriFone Sec. Litig., 11 F.3d 865, 868 (9th Cir. 1993)).

Review on a motion pursuant to Fed.R.Civ.P. 12(b)(6) is normally limited to the complaint itself. See Lee v. City of Los Angeles, 250 F.3d 668, 688 (9th Cir. 2001). If the district court relies on materials outside the pleadings in making its ruling, it must treat the motion to dismiss as one for summary judgment and give the non-moving party an opportunity to respond. Fed.R.Civ.P. 12(d); see United States v. Ritchie, 342 F.3d 903, 907 (9th Cir. 2003). "A court may, however, consider certain materials — documents attached to the complaint, documents incorporated by reference in the complaint, or matters of judicial notice — without converting the motion to dismiss into a motion for summary judgment." Ritchie, 342 F.3d at 908.

If documents are physically attached to the complaint, then a court may consider them if their "authenticity is not contested" and "the plaintiff's complaint necessarily relies on them." Lee, 250 F.3d at 688 (citation, internal quotations and ellipsis omitted). A court may also treat certain documents as incorporated by reference into the plaintiff's complaint if the complaint "refers extensively to the document or the document forms the basis of the plaintiff's claim." Ritchie, 342 F.3d at 908. Finally, if adjudicative facts or matters of public record meet the requirements of Fed.R.Evid. 201, a court may judicially notice them in deciding a motion to dismiss. Id. at 909; see Fed.R.Evid. 201(b) ("A judicially noticed fact must be one not subject to reasonable dispute in that it is either (1) generally known within the territorial jurisdiction of the trial court or (2) capable of accurate and ready determination by resort to sources whose accuracy cannot reasonably be questioned.").

DISCUSSION

Both Qwest and the PUC move to dismiss Western's Second Cause of Action and request for jury trial. Additionally, the PUC moves to dismiss Western's section 1983 claims.

Regarding the Second Cause of Action, both parties assert that in Docket ARB 537 Western failed to allege that Qwest did not negotiate in good faith, which was required by the Ninth Circuit before filing suit in district court. See Western Radio Servs. Co., 530 F.3d 1186. Additionally, Qwest argues that the PUC has not addressed such a claim in either Order No. 05-1075 or 06-001 as required by Western Radio. Moreover, Qwest contends that Western's petition (Docket ARB 706) was improper, defective, contained vague statements regarding good faith negotiations, and failed to ask the PUC to determine whether Qwest negotiated in good faith as required by Western Radio.

Regarding Western's request for a jury trial, the defendants assert that a jury trial is inappropriate because this matter is before this court on appellate review of the decisions of the PUC and is properly reviewed on the record before the PUC. Finally, the PUC contends the inclusion of § 1983 claims was an inadvertent error on behalf of Western's attorney and this fact was confirmed by Western's attorney on February 11, 2009.

The PUC's determination of Western's good faith claim

In Western Radio, the Ninth Circuit held that a requesting carrier cannot sue an incumbent local exchange carrier for a failure to negotiate in good faith until the PUC has addressed the good faith claim. 530 F.3d at 1189. The court acknowledged that while it was unusual to require one private party to exhaust its administrative remedies before bringing suit against another private party, policy factors favored this requirement. Id. at 1199.

The Ninth Circuit instructed this court to determine whether the PUC in its order approving the interconnection agreement had "decided the good faith questions Western seeks to litigate, as well as the ultimate effect of the PUC's decision on the current litigation." Id. at 1203. The PUC issued two orders in this case (1) Order No. 05-1075, Docket ARB 537, approving the proposed interconnection agreement submitted by Qwest; and (2) Order No. 06-001, Docket ARB 706, dismissing Western's petition for arbitration that Western filed four days after Order No. 05-1075 issued. I will consider both orders in turn. Before I do that, it is important to note that each docketed petition for arbitration is a separate case independent of, and different from, any other arbitration proceeding.

Although not explicit in its mandate, when the Ninth Circuit referred to an approved interconnection agreement it was implicitly referring to Order No. 05-1075, Docket ARB 537, as this is the only order approving an interconnection agreement between Western and Qwest.

The Ninth Circuit took judicial notice of the PUC's Order No. 05-1075 because its existence was "capable of accurate and ready determination by resort to sources whose accuracy cannot reasonably be questioned." Fed.R.Evid. 201(b); Nugget Hydroelectric, L.P. v. Pac. Gas Elec. Co., 981 F.2d 429, 435 (9th Cir. 1992) (taking judicial notice of the existence of decisions of the California Public Utility Commission on force majeure claims). Likewise, this court takes judicial notice of Order Nos. 05-1075 and 06-001.

(1) Order No. 05-1075 approving Qwest's proposed interconnection agreement

Before specifically discussing Order No. 05-1075 it is noteworthy that both orders precede the Ninth Circuit's mandate. In other words, neither the PUC, its commissioners, nor Western had the benefit of the Ninth Circuit's mandate. Since the Ninth Circuit's mandate issued, Western has not presented its claim to the PUC. In Order No. 05-1075, the PUC neither expressly nor impliedly addressed Western's good faith claims. First, the PUC held:

[P]arties subject to the 252(b) process are plainly required to go through the steps set forth and are not free to walk away from the arbitrated interconnection agreement if they are displeased with the outcome of the arbitration process before the state commission. Indeed, if they were free to do so, it would render the concept of compulsory arbitration meaningless. Section 252(e)(1) provides that `Any interconnection agreement adopted by negotiation or arbitration shall be submitted for approval to the State commission.'
An arbitrated interconnection agreement, with the disputed terms as decided by the Arbitrator and adopted by the commission, has the same legal power to bind the parties as if the agreement had been freely entered into by both parties prior to its submission to the commission. One party cannot simply refuse to execute and honor the agreement because of disappointment with the outcome of the arbitration proceeding. The only avenue open to the party by federal statute is the section 252(e)(6) appeal process which states: `In any case in which a State commission makes a determination under this section, any party aggrieved by such determination may bring an action in an appropriate Federal district court to determine whether the agreement or statement meets the requirements of section 251 and this section.'

Order No. 05-1075, p. 3-4 (emphasis supplied in original).

Next, the PUC quoted a portion of this court's opinion regarding the court's lack of subject matter jurisdiction until the PUC either approves or rejects an interconnection agreement. Order No. 05-1075, p. 4. The PUC did not discuss the good faith claim, presumably because Western failed to present this claim to the PUC while the proposed interconnection agreement was under consideration. Western admits this failure. See Declaration of Richard Oberdorfer in support of Response to motions to dismiss. See also Ninth Circuit's discussion of how Western likely could have raised this issue to the PUC. Western Radio Servs. Co., 530 F.3d at 1198.

A portion of this court's opinion discussing the good faith claim is quoted in the background section of the order. However, this only indicates that it was improper for Western to file suit in federal court before seeking mediation or arbitration with the PUC.

"I, [Richard Oberdorfer], am not aware of any provision in the PUC's rules for filing such comments without PUC requesting input. The PUC approved the Qwest version without input from Western Radio, and did not do that until Judge Aiken dismissed the complaint in this matter." Declaration of Richard Oberdorfer in support of response to motions to dismiss, ¶ 8. Additionally, Western asserts that in its petition to initiate Docket ARB 537 it alleged that Qwest failed to "negotiate an agreement as required by 251(c)(1), the statute which includes the good faith requirement." Id. at ¶ 2. However, this allegation concerns issues arising before arbitration not during. See 47 U.S.C. § 252(b)(5).

In addition, since the Ninth Circuit's mandate, Western has failed to present its good faith claim to the PUC. Accordingly, the PUC has neither expressly nor impliedly addressed Western's good faith questions that it now seeks to litigate. The PUC must first do so for prudential reasons as discussed by the Ninth Circuit. See id. at 1196-1205.

(2) Order No. 06-001 dismissing Western's arbitration petition

Likewise, in Order No. 06-001, the PUC neither expressly nor impliedly addressed Western's good faith claims. The PUC dismissed Western's petition for arbitration (Docket ARB 706) as improper. First, it held the petition was improper because it would be inappropriate to allow Western to ignore the recently approved interconnection agreement. The PUC held:

An approved interconnection agreement remains in effect for three years. See Section XXII.B.1, Ex. 3, p. 39, attached to original complaint. Notably, this three-year period has now lapsed. Accordingly, the parties could renegotiate the approved interconnection agreement.

Just as it is inappropriate to allow Western to ignore the results of an arbitration proceeding by refusing to enter into an agreement consistent with the Commission's arbitration decision, it is likewise inappropriate for Western to attempt to commence arbitration of a new interconnection agreement only days after the Commission-arbitrated and approved interconnection agreement became effective. As Qwest points out, entertaining Western's Petition would essentially render the Commission's arbitration decisions meaningless. Both parties are expected to abide by the terms and conditions of the Approved Agreement until it expires or they voluntarily negotiate a new agreement.

Order No. 06-001, p. 3. Second, the PUC held the petition improper because it was based upon an incorrect assumption that Qwest had attempted to renegotiate the approved agreement. The PUC held:

The Commission already considered and rejected this argument in Order No. 05-1075. There we held: `We also find that the Qwest letter of May 10, 2005, notifying radio carriers that it was withdrawing Section 20 of Oregon Tariff 29 as a result of the Federal Communications Commission's T-Mobile decision [citation omitted] and putting an interim tariff in place . . . in no way constituted a `request for negotiation.' Order No. 05-1075 at 4.'

Order No. 06-001, p. 3-4.

Nonetheless, Western maintains that in its petition it "submitted the good faith claim squarely to the PUC," but that the PUC "refused to address the issues." Plaintiff's Response to Qwest's motion to dismiss, p. 5. In Order No. 06-001 the PUC neither expressly nor impliedly addressed any of the issues presented by Western's petition, nor did it address the issue of Qwest's alleged failure to negotiate in good faith. Rather, as discussed, it dismissed the petition as improper.

Western relies on exhibit A attached to Plaintiff's Brief on Remand to support this assertion. Notably this document is neither the original petition nor a copy of the original petition. In addition, this exhibit differs in several ways from what is likely the original petition, which is attached to Qwest's Memorandum in Support of Qwest's Motion to Dismiss. Most notably, it is unsigned, it lists the wrong date of submission, it is not marked as Docket ARB 706, it raises only three issues whereas the document supplied by Qwest raised five issues, and finally the issues raised are worded differently than the document supplied by Qwest. Accordingly, I do not take judicial notice of this document. However, regardless of whether judicial notice of this document is taken it is not dispositive of the issues before the court. The PUC in dismissing Western's petition did so on the grounds that its petition was improper and not based on the substantive issues of the petition.

Consequently, the PUC has not made any substantive determination of Western's good faith claim in Order No. 05-1075 or 06-001. Western's efforts have been insufficient to comply with the prudential concerns discussed in the Ninth Circuit's mandate. Accordingly, Western's Second Cause of Action is dismissed because it must first seek relief with the PUC before it brings its good faith claim in this forum.

Western argues any "procedural defects in [its] presentation of the good faith issue to the PUC . . . should be overlooked" because it appeared pro se before the PUC. Plaintiff's Response to Qwest's motion to dismiss, p. 6. This argument is groundless. The PUC dismissed Western's petition because an approved interconnection agreement was already in effect not because of any procedural defects.

Western's 42 U.S.C. § 1983 claims

The court notes that Western's most recent complaint does not include a section 1983 cause of action. The PUC asserts Western's inclusion of the 42 U.S.C. § 1983 claim in its caption, paragraphs one and nine, and the prayer were inadvertent error on behalf of Western's attorney. Western concedes this in its response stating that it "regrets the drafting error." Plaintiff's Response, p. 1. Accordingly, the § 1983 claims are dismissed.

Western's request for a jury trial

A jury trial is inappropriate for Western's remaining claim. Western's First Cause of Action requests judicial review to determine whether the PUC's decisions were consistent with 47 U.S.C. §§ 251 and 252. Accordingly, Western's request for a jury trial is denied. 47 U.S.C. § 252(e)(6). See also US West Communs., Inc. v. Jennings, 304 F.3d 950, 957 (9th Cir. 2002) ("the district court's role under the Act is to determine whether `the agreement or statement meets the requirements of section 251 [and section 252]'" (quoting 47 U.S.C. § 252(e)(6)).

CONCLUSION

Defendant Qwest's motion to dismiss (doc. 62) and defendant PUC's motion to dismiss (doc. 60) are granted.

IT IS SO ORDERED.


Summaries of

Western Radio Services Co. v. Qwest Corporation

United States District Court, D. Oregon
May 5, 2009
Civil No. 05-159-AA (D. Or. May. 5, 2009)
Case details for

Western Radio Services Co. v. Qwest Corporation

Case Details

Full title:WESTERN RADIO SERVICES CO., an Oregon corporation, Plaintiff, v. QWEST…

Court:United States District Court, D. Oregon

Date published: May 5, 2009

Citations

Civil No. 05-159-AA (D. Or. May. 5, 2009)

Citing Cases

W. Radio Servs. Co. v. Qwest Corp.

On remand from the first appeal, the district court examined the 2005 and 2006 PUC orders. W. Radio Servs.…